Route History

 

Date of introduction
Gar
Mon-Fri
Sat
Sun
06.04.96
PE
1 midi
1 midi
--
LOGO NEW CONTRACT

BARNET The Spires Barnet Church - High Barnet Station,Barnet Hill - Fairfield Way - Sherrards Way - Western Way - Grasvenor Avenue - Fairfield Way - and back to Barnet Spires via High Barnet Station(Mon-Sat shopping hours )
NEW ROUTE replacing part of Route 399 - jointly operated with Route 399 and operated by Thamesway

412

412 AT THE SPIRES

This image available on the
First London download


26.09.98
PE
1 midi
1 midi
--
Operation transferred to First Capital

03.02.01
NP
1 midi
1 midi
--

Allocation transferred from Ponders End depot to Northumberland Park

07.04.01
NP
1DMS
1DMS
--

Start of new contract and converted to new low floor buses

dm780

DM780 Barnet stand

This image available on the
First London download


08.04.06
NP
1DMS
1DMS
--

Contract renewal

09.04.11
NP
1DMS
1DMS
--

Contract renewal

31.03.12
NP627
1SEN
1SEN
--
logo Contract novated to
London General
2014 map
Extracted from 2014 map drawn by Mike Harris
The Greater London Bus Map
09.04.16
NP627
1SEN
1SEN
--

Contract renewal

389 times

 

Operating Garages

PE Ponders End
Crew changeover point ?

NP Northumberland Park
Crew changeover point ?

Tender specifications